The following types of posts are acceptable for mailbox supports: According to USPS standards, a mailbox must be installed so the bottom of the mailbox is between 41 inches and 45 inches above the road shoulder. Greater offset distances are encouraged so the mail carrier can move out of traffic. Mailboxes should be set back at a minimum of one foot from the edge of the shoulder, regardless of whether the shoulder is gravel or paved. These standards are based on guidelines established by the American Association of State Highway and Transportation Officials. Postal Service and the following Ottawa County Road Commission standards. The location and construction of mailboxes shall conform to the rules and regulations of the U.S. REMINDER-A permit MUST be obtained from the OCRC in order to construct, reconstruct, relocate, surface or resurface a driveway or private road approach adjoining a road within the Road Commission’s ROW. There is an additional expense for concrete testing and quality assurance.Ĭurbed roads are milled and resurfaced, therefore it is not necessary to change the driveway approach. In most cases, asphalt driveways can be placed at the same time the contractor is paving the lane of the road. Concrete can take up to 28 days to fully cure, where asphalt can be driven on the same day.In order to maintain access for the property owner, concrete driveways are often required to be poured half width at a time, where asphalt can be placed the full driveway width.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |